Local

Why is the road to Hilton Head’s post office closed? Here’s what the town is doing

Key Takeaways
Key Takeaways

AI-generated summary reviewed by our newsroom.

Read our AI Policy.


  • Town closed William Hilton Parkway entrance to build connector roads to Northpoint.
  • Phase 1 closes William Hilton Parkway entrance/exit and half the parking lot.
  • Phase 2 closes the Gumtree entrance and finishes roads, pathways and parking lot.

The entrance to Hilton Head Island’s post office at U.S. 278 is closed, but the office itself remains open.

On Monday, the Town of Hilton Head Island closed the William Hilton Parkway entrance to begin constructing roads that will connect Northpoint on Jarvis Creek, the workforce housing neighborhood currently under construction in partnership with OneStreet Residential.

During the first phase, the entrance to the post office will be from Gumtree Road. Because half of the parking lot is closed, the town is urging caution; drivers must back out of their parking spots to leave the post office.

Here are the phases of construction and how to navigate them.

The entrance to the United States Post Office Fairfield Station off U.S. 278 is closed to traffic as photographed on June 2, 2026 on Hilton Head Island. While the highway entrance is closed, the post office remains open and can be reached by using Gum Tree Road during the first phase of construction.
The entrance to the United States Post Office Fairfield Station off U.S. 278 is closed to traffic as photographed on June 2, 2026 on Hilton Head Island. While the highway entrance is closed, the post office remains open and can be reached by using Gum Tree Road during the first phase of construction. Drew Martin dmartin@islandpacket.com

Phase 1: June 1-July 31

The William Hilton Parkway entrance and exit and half of the parking lot will be closed.

The new road and pathway from Northpoint on Jarvis Creek to Marsh Point Drive will be built, and the first half of the parking lot will be rebuilt.

Phase 2: Aug. 1-Nov. 15

During this phase, the Gumtree entrance and exit will be closed, shifting access back and only to William Hilton Parkway.

The road and pathway work and the second half of the parking lot will be completed.

Phase one construction has closed the U.S. 278 entrance to the USPS Fairfield Station on Hilton Head Island.
Phase one construction has closed the U.S. 278 entrance to the USPS Fairfield Station on Hilton Head Island. Town of Hilton Head Island
Related Stories from Hilton Head Island Packet
DM
Drew Martin
The Island Packet
Island Packet and Beaufort Gazette visuals editor Drew Martin has been in the media industry for more than 25 years in visual storytelling. He has disseminated news using a variety of storytelling methods, including the use of info-graphics, photography, animation and video. Support my work with a digital subscription
Get unlimited digital access
#ReadLocal

Try 1 month for $1

CLAIM OFFER