The U.S. 278 median crossover in front of St. Gregory the Great Catholic Church was closed during work on the highway, wreaking havoc on parishioners arriving and departing. Construction is over, but a longer-term problem remains: How to get them safely onto the highway in both directions.
The U.S. 278 median crossover in front of St. Gregory the Great Catholic Church was closed during work on the highway, wreaking havoc on parishioners arriving and departing. Construction is over, but a longer-term problem remains: How to get them safely onto the highway in both directions. Staff photo
The U.S. 278 median crossover in front of St. Gregory the Great Catholic Church was closed during work on the highway, wreaking havoc on parishioners arriving and departing. Construction is over, but a longer-term problem remains: How to get them safely onto the highway in both directions. Staff photo

Traffic

Berkeley Hall shoots down frontage-road settlement

December 17, 2013 7:18 PM

  Comments  

Videos