Lane striping on both sides of S.C. 170, between U.S. 278 and S.C. 46 in greater Bluffton, is planned this week. The work, originally scheduled for last week, was postponed by bad weather.
If weather cooperates, the work will be done between 7 p.m. and 7 a.m. Monday through Friday , according to Jason Dunn of contractor Cleland Site Prep.
Motorists are asked to be cautious during these times and to be aware of workers and equipment that could be on or near the roadway.




